The Great Lakes Group

Blog

Great Lakes Shipyard Awarded Drydocking Contract for Durocher Marine Barge

Great Lakes Shipyard was awarded a drydocking contract for Durocher Marine. The barge was hauled out using the 770-ton capacity Marine Travelift on May 18, 2016. Maintenance and repairs included routine drydocking, steel repairs and load line renewal.

DSC_0559-lo-res