The Great Lakes Group

Blog

Drydocking & Repairs on Luedtke’s Tug KRISTA S.

Luedtke Engineering’s tug KRISTA S. arrived at Great Lakes Shipyard on Friday, March 22.  It was hoisted out of the water using the 770-ton travelift.  The tug is being drydocked for an underwater hull survey and various repairs.  The KRISTA S is expected to be back in the water sometime early this week.

Krista S