The Great Lakes Group

Blog

USACE Tug DONLON Back in the Water at Great Lakes Shipyard

Great Lakes Ship­yard recent­ly com­plet­ed dry­dock­ing, main­te­nance and repairs on the 53-foot Unit­ed States Army Corps of Engi­neers (USACE) Buf­fa­lo Dis­trict Tug DONLON. Watch as the ves­sel is put back in the water using the 770-ton Marine Travelift.