USACE Tug DONLON Back in the Water at Great Lakes Shipyard
05/13/2015
Great Lakes Shipyard recently completed drydocking, maintenance and repairs on the 53-foot United States Army Corps of Engineers (USACE) Buffalo District Tug DONLON. Watch as the vessel is put back in the water using the 770-ton Marine Travelift.