The Great Lakes Group

Blog

Great Lakes Shipyard Awarded Drydocking Contract for Durocher Marine Barge

Great Lakes Ship­yard was award­ed a dry­dock­ing con­tract for Durocher Marine. The barge was hauled out using the 770-ton capac­i­ty Marine Trav­elift on May 18, 2016. Main­te­nance and repairs includ­ed rou­tine dry­dock­ing, steel repairs and load line renewal.

DSC_0559-lo-res