The Great Lakes Group

Blog

US Geological Survey R/V KIYI Returns to Great Lakes Shipyard for Five-year Survey & Inspection

Great Lakes Ship­yard has been award­ed a con­tract for the Unit­ed States Geo­log­i­cal Sur­vey R/V KIYI. The research ves­sel was hauled out using the 770-ton capac­i­ty Marine Trav­elift at Great Lakes Ship­yard. The repair con­tract that start­ed on Sep­tem­ber 5, 2014 includes:

  • Dry­dock­ing
  • Rou­tine Repairs & Maintenance
  • ABS Five-Year Sur­vey & Inspec­tion for Load Line
  • Clean & Paint Under­wa­ter Hull, Decks & Superstructure
  • Over­haul Main Engines & Generators
  • Main­te­nance of Propul­sion & Steer­ing Systems
  • Mod­i­fy Exhaust Stacks & Per­form Major Acoustic Modifications

This will be the fourth time that KIYI was dry­docked at Great Lakes Ship­yard. In 2004 and 2009, KIYI was hauled out for a Five-Year Sur­vey and Inspec­tion. Then in 2010 Great Lakes Ship­yard installed a new anchor pocket.